Ruwais Hospital Extension, UAE - structural engineering by ESG

Client sector: Healthcare  |  Location: UAE  |  Asset: Live-hospital extension and new steel facilities

ESG provided the structural engineering for the Ruwais Hospital Extension. The project added capacity to a hospital while it stayed in full operation. Our brief was to design for safe construction above and beside live clinical areas. The design team therefore chose steel framing for speed and a light structural footprint.

Project Overview

The works extend the existing hospital in two ways. First, the project added new facilities above the existing hospital roof. Second, two further buildings stand independently on the site. These are a triage building and a warehouse for storage. The triage building was the most critical structure in the brief.

Scope of Work

  • Structural analysis, modelling, and calculations for steel-framed buildings.
  • Preparation of all detailed structural design drawings.
  • Assessment of the existing structure before adding new loads.
  • Design of independent foundations for the new facilities.
  • Coordination with the live hospital’s ongoing operations.

Structural Approach

Because the steel was lightweight, added loads on the existing frame stayed low. ESG checked the roof-level additions against the original design capacity. The independent triage and warehouse buildings used their own foundations, so they stayed isolated from movement of the existing structure. Connections were detailed for fast, low-disruption erection.

Durability and Standards

The steel design follows recognised international codes. Protective detailing was specified for the coastal environment. The design also prioritised the triage facility for emergency resilience. The extension expanded capacity without closing the working hospital.

Project Outcomes

The Ruwais Hospital Extension lifted hospital capacity without pausing patient care. Building above the live roof demanded careful load control throughout. At the same time, the project delivered the standalone triage and warehouse buildings. Steel framing kept the programme short and the site disruption low, while ESG’s checks confirmed the existing structure could carry the new additions. As a result, the hospital is larger and more resilient, and it stayed open throughout.

Work with ESG

Have a structural challenge like this?

Our chartered engineers deliver design, assessment and monitoring across the UAE, the Gulf and the United Kingdom. Tell us about your project.